Preparation: Make 4 cuts as illustrated above within the rough opening.
Push the material inward.
Fold flashing towards the inside the structure and out of the way as shown above. Secure flaps to interior studs.
Make 6” diagonal cuts on 45 degree angles to both upper corners.
Expose the sheathing by temporarily taping the flap of Sahara™ out of the way.